Established in 2002, Viet Duc Steel commenced operations with the VG Pipe manufacturing plant, encompassing nearly 30 hectares in the Binh Xuyen Industrial Park, Vinh Phuc province. In 2008, Viet Duc Steel’s shares were officially listed on the Hanoi Stock Exchange under the ticker symbol VGS, marking a pivotal milestone for a private enterprise in Vietnam’s steel industry.
Today, Viet Duc Steel has transformed into a dynamic, diversified group with two primary business segments:
Steel manufacturing – Commercial real estate
Viet Duc Steel takes pride in providing high-quality products for national key projects. Embracing a changing world, we have stood shoulder to shoulder with our customers, partners, and the community, building a robust foundation that propels us for a steadfast future, united in our pursuit of societal progress and development.
With over 22 years of experience, Viet Duc Steel’s products e.g steel pipes, coils, and construction steel have laid the foundation for national key projects, actively contributing to Vietnam’s industrialization and modernization endeavors. Harnessing cutting-edge production technology and techniques, Viet Duc Steel has solidified its position as a reputative manufacturer and supplier of steel products nationwide, earning the trust from contractors, investors, and construction firms.
Harnessing cutting-edge production technology and techniques, Viet Duc Steel has solidified its position as a reputative manufacturer and supplier of steel products nationwide, earning the trust from contractors, investors, and construction firms.
Location
No. 2, Doc Lap, Quan Thanh, Ba Dinh, Hanoi
It is the place where Congress Meeting taken place and is used to welcome international guests of the Party and State.
Scale
National Assembly Building project includes 2 basement floors and 5 above floors.
The National Assembly Building is 39m high, has a square architecture, a circular meeting room in the middle, includes 2 basement floors and 5 above floors. Its floor size is 102m x 102m, and the total floor area is over 60,000 m2.
In addition, the building also has a 3-level underground parking area with a capacity of 500 cars and an area of over 17,000 square meters. It also has the 60m-long tunnel connecting the National Assembly Building and the Ministry of Foreign Affairs, with 2 sections for pedestrians and for cars.
The construction project of Nhat Tan bridge and the road passing through Tay Ho district and Dong Anh district (Hanoi city) at both ends of its has a total investment of more than 13.600 billion VND.
The total length of the project is 8.933m. Specificially, Nhat Tan bridge is 3.755m long, and its cross section is 33.2m long, which are compliance to the bridge’s permanent design scale.
The main bridge is a continuous cable-stayed bridge with 5 towers with a total length of 1.500m (main spans are 300m long). The road at both ends of the bridge has a total length of 5.178,8m. There will be 4 intersections, including 3 intersections at different levels, on the entire route.
Location
Me Tri Commune and Trung Hoa Ward, Hanoi It is the place where large-scale domestic, international conferences and seminars taken place.
Scale
Total investment capital is over 4.000 billion VND
It is a multi-purpose project, built on a floor area of 60.000 m2, with a 50m high roof.
Main meeting room has 3.800 seats
20 small meeting rooms, conference areas, press rooms, banquet rooms, exhibition areas, etc.
In front of the building, there is a square of nearly 10.000 m2 and a water square, creating a beautiful landscape for the project
Location
Vinhomes Skylake Apartment has a construction area of 2.3 hectares, located at lot E3.1 Pham Hung, Cau Giay New Urban Area, Hanoi, which is next to the 19-hectare Cau Giay lake.
Scale
The project scale includes 3 buildings: S1, S2, S3, with a total of more than 1,800 apartments. According to the architectural construction planning, buildings S1 and S2 share a podium. Along with building S3, both podiums will have a 3-storey structure including commercial and service center, apartment floors will start from the 4th floor.
The project’s construction density is 32.5%, which means the green area will cover the entire space. Combined with the green park next door, the apartment complex has a fresh and cool environment in the heart of the Capital.
Investor
Tổng công ty Phát triển hạ tầng và Đầu tư tài chính Việt Nam
Contractor
Namkwang HQ, Keangnam, Cienco1, Tập đoàn Sơn Đông…
Consulting/Supervision
Joint venture: MI – VJEC
Scale
24,566 billion VND
With over 22 years of tireless efforts, Viet Duc Steel has harvested the fruits of its labor: the trust of our customers and partners, the prestigious awards, and the recognition as a leader in Vietnam’s steel industry. Our achievements include the First-Class Labor Medal, the Asia-Pacific Quality Award, the National Quality Gold Award, commendations from the Prime Minister, and the Sustainable Green Enterprise Award.